Diane. Here's exactly where we are.

You told her you'd help with the application. That help already exists — and her own newest numbers are in our hands. This page is the honest map: what's ready, what's drafted for your eye, what only she can answer, and the clock. Nothing has been sent.

The headline

Her cost worksheet went from blank to about 80% priced — using HER OWN numbers. And the one section she admitted she's stuck on, we already have the answer to.

On Aug 17 she handed over three files: her new bid numbers, her application story, and the state law she's been studying. In her own application she wrote, next to the legal-compliance section: "I am still studying this." Our estate has held the finished answer to that exact section since before she sent it. Finishing her stuck section with her own numbers organized around it — that's the mind-blow, ready tonight.

What you could send her tonight — your call

A — The tonight package

Two things, small and personal: her stuck legal section, finished (drafted below for your eye), and her own cost worksheet, organized and totaled with the four missing bids clearly flagged. Answers exactly what she's blocked on. Ready the moment you approve the words.

B — The full application draft

Every section of the City's form with her new numbers dropped in. This is a working session — best done with your eyes on it, section by section, per your own rule. Not a tonight thing unless you want to sit with it.

Drafted for your eye — her stuck section, finished

DRAFT — your eye first, then it can go to her
We are in compliance with 7-15-4288, MCA. The costs for which matching funds are requested fall within the categories authorized by 7-15-4288(1), MCA, and the urban renewal powers enumerated in 7-15-4233, MCA. The restoration of the building's windows, doors, masonry, window wells, and gutters constitutes the improvement and rehabilitation of real property within the Railroad Urban Renewal District, undertaken in conformance with the adopted RURD Plan (Ordinance 3214) and its goals of revitalization, private investment, and preservation of historic character. The accessible entrance and extended ADA ramp serve the additional public purpose of accessibility. No costs incurred prior to funding approval are included in this request. Each line of the attached cost worksheet has been aligned to the statute's eligible-cost categories, and we will confirm that alignment line-by-line with Community Development staff prior to the hearing.

Written to drop into her application exactly where she wrote "I am still studying this." It commits to nothing the City hasn't confirmed — the line-by-line confirmation with City staff is built into the language.

Her numbers — her own worksheet, organized

These are HER figures from HER file. Her own subtotals add to $63,326; counting every priced line, about $68,631. She never wrote a grand total — so neither do we without saying so.

WorkHer number
Office windows — Milgard, Custom Glass & Windows$5,560her subtotal
Office window labor & materials — JTC$1,400
Front shipping windows — Custom Glass & Windows$4,746her subtotal
Front window labor & materials$1,200
Basement windows — Every Window, 3$2,704.59
Masonry / repointing — Karson Klass$6,300real bid, scope in writing
Overhead doors (5) — Overhead Door Co. of Helena$19,220APPROVED Jul 21 · deposit $11,532 due Sep 8
Bifold barn / double-hinged doors — JTC$5,400
Remove concrete from doors + restore — JTC$6,000
Window wells — JTC$1,000
Remove concrete from covered windows (8) — JTC$1,600
Restore window encasements (8) — JTC$6,000
Handicapped entrance, panic bar$5,000
Mural restoration — JTC, with John Horne's blessing$2,500brand-new scope
ADA extended rampTBDstill open
Man doors (2)no bid yetstill open
Gutters — whole buildingno bid yetstill open
Disposal of removed materialsno bid yetstill open
Graffiti removal (2 instances)unpricednew scope from her narrative

The clock

Aug 27 — one weekFirst window quotes expire (second set Sep 5)
Sep 8Overhead-door deposit of $11,532 comes due
2nd Tuesday, 1:30pmThe City board that hears these — date to confirm with staff

What we already hold (nothing needs rebuilding)

Only she or Stephen can answer

Only you

Nothing sends without your word. Every earlier page you rejected stays closed. This board is the honest state, not a rebuild.